Baltimore, MD - June 3, 2024 - On Saturday, salvage crews completed the lift of a 470-short-ton (940,000 pounds) steel section of Francis Scot Key Bridge truss from the federal navigation channel, according to a recent post from U.S. Army Corps of Engineers, Baltimore District.
Buried deep in the river mudline, the section was part of the massive steel truss that pinned the The Dali for seven weeks.
The current specs of the Unified Command's "limited access channel" (50-foot depth x 400-foot width) allows all shipping traffic to enter/exit the Port of Baltimore.
These final lifts are an important next step to re-opening the full 700-foot width of the navigation channel.... Read More: FOX45